
These drawings shall be prepared in A4 size only. 400 kV OHL SS Belgrade West WPP ibuk 1 (app.
Connections with 400 kv and 154 kv substations, conductors, opgw etc.Pachpadra)/Type/Annot/AP>endobj282 0 obj/ProcSet/ExtGState>/Type/XObject/BBox/FormType 1>stream inspection & testing, supply of 400 kV double circuit transmission line. Substation (SS) 400/110 kV Belgrade West with the alignment of the 400 kV and 110 kV OHLs 2. Painting of towers &supply and erection of span markers, obstruction markers for aviation requirements. Stringing of Power line crossing section. Summarise the content and the changes to an existing drawing in the content column. Destringing & dismantling of existing 154 kV Transmission line Description of the project: Project ID: 2015/101921-129 Project: Turkish Electricity Transmission Network - West Power System Improvement Project Bid/Contract Reference No: H.344 Ref. SUBSTATION HIGH VOLTAGE EQUIPMENT 4.1 Drawings The Design Engineer (Verification) and Design Engineer (Assurance) shall agree and list below those drawings that must be prepared and agreed prior to DID freeze (the following list is typical).
Installation of FODP (Fiber Optic Distribution Panel) and cables. Erection of towers, tack welding of bolts and nuts including supply and application of zinc rich paint, fixing of insulator strings, stringing of conductors and OPGW along with all necessary line accessories. The horizontal clearance between the nearer conductor and any part of such building. 3.7+ (0.3 for every additional 33 KV ) Up to 11 KV. Line passes above or adjacent to any building or part of a building.
Supply & Installation of Tower Earthing. Line passes above or adjacent to any building or part of a building. review of as-built drawings preparation of project reports. Construction of foundations for different type of tower and casting of foundations for tower footings as per Employers foundations drawing Construction of a 400 kV D/C line between Karuma HPS Substation and Kawanda Substation (264 km) Upgrading of Kawanda and Karuma Substations (line bays, transformers, busbars, control and protection). OPGW & associated fittings and accessories. Supply of all types of tower accessories like phase plate, circuit plate, number plate, danger plate, anti-climbing device, Bird guards,. The 400 kV OHTL Vulcanesti - Chisinau with a length of 157 km, was made on. Fabrication and supply of all type of transmission line towers, including road,river crossing towers as per Employers design/drawings including fasteners, step bolts, hangers, D-shackles etc. Design, execution and completion of a 33/11 kV primary substation to provide. Detailed survey including route alignment, profiling, tower spotting, optimization of tower locations, soil resistivity measurement & geotechnical investigation (including special foundation locations pile/well foundation). Transmission Line between Denizli Cim - Bozkurt Substations ģ) 154 kV Double circuit with 1272 MCM conductor transmission line - 16,7 km Minimum Clearance in Substation: Voltage Highest Voltage Lighting Impulse Level (Kvp) Switching Impulse Level (Kvp) Minimum Clearance Safety Clearance(Mt) Ground Clearance(Mt) Phase-Earth Phase-Phase 11KV 12KV 70 0.178 0.229 2.600 3.700 33KV 36KV 170 0.320 0.320 2.800 3.700 132KV 145KV 550 1.100 1.100 3.700 4.600 650 1.100 1.100 2. 2015/101921-129ġ) 380 kV Double circuit triple bundled (3B) with 1272 MCM conductor transmission line - 2,16 kmĢ) 380 kV Double circuit triple bundled (3B) with 1272 MCM conductor transmission line - 2,20 km National Grid has awarded engineering-led construction firm Burns & McDonnell a 14 million (18.8 million) engineer-procure-construct (EPC) contract for the design, supply, installation, and commissioning of a 400-kV GIS substation. Project: Turkish Electricity Transmission Network - West Power System Improvement Projectīid/Contract Reference No: H.344 Ref. National Grid awards 19 million GIS substation contract.